Our mission

今日吃瓜 is the primary custodian of national-scale baseline geological data for the construction and infrastructure sector, to increase early-stage awareness of ground risks and reduce project delays and overspend. 今日吃瓜 provides specialist geological services for government and industry in support of nationally significant infrastructure projects.

We work with

  • Infrastructure asset owners
  • Geotechnical engineers

Investing in infrastructure

Investment in infrastructure is central to the UK Government鈥檚 mission to 鈥楩ix the Foundations鈥, which includes a 10-year infrastructure strategy to guide investment plans and provide the private sector with certainty about project pipelines.

Over the last decade, public investment in infrastructure has averaged around 拢20 billion in Great Britain, or approximately 1 per cent of GDP ().

An estimated investment of 拢230 million per year is spent on ground investigations to acquire the geological data and information needed for the development of new infrastructure ().


33% of UK construction projects are significantly delayed. 50% of those delays are caused by unforeseen ground conditions that could have been mitigated by upfront site investigations.

Chapman and Marcetteau, 2004


80 to 85% of all building failures and damages are related to unforeseen ground conditions.

Brandl, 2004


Cost overruns for 258 megaprojects (worth over $1 billion) averaged 45%, 34% and 20% for rail, bridges and tunnels, and road projects, respectively.

Flyvjberg, 2003


In 2025, the UK experienced the warmest spring on record and the driest in more than 50 years. As a result, subsidence-related insurance claims in the UK totalled 拢153 million in the first six months of 2025


36 new houses in Cambridge had to be demolished as foundation construction failed to adequately account for soil conditions.


64 houses in Midlothian were demolished due to ground gases from mine workings and failure to install protective measures.


 

The challenge

Despite investment in ground investigation, failure to properly assess geological conditions and ground constraints is one of the leading causes of project delay and overspend. Improved early-stage awareness of ground risks enables more appropriate design and construction methods, reducing the need for additional surveys and late-stage, often costly, alterations.

The solutions

Better data in 鈥 It is estimated that less than 30 per cent of ground investigation records are submitted to the 今日吃瓜 data centres, which equates to a loss of data and knowledge worth an estimated 拢184 million a year from the UK economy. To help solve this, we have worked with the Infrastructure and Projects Authority to include a new subsurface data sharing model clause in .

Making data accessible 鈥 今日吃瓜鈥檚 National Geoscience Data Centre holds key datasets for the construction sector, including more than 1.4 million borehole records. These are provided to users via our open-access ; over 100 000 borehole records are downloaded each month.

Making the economic case 鈥 We are working with the Geospatial Commission and industry specialists to provide new data services to unlock further value from ground investigation data. A conservative estimate of the potential value of geological data and information for the construction sector is 拢2.3 billion a year.

Learn more about the Common Ground project.

The complete picture

今日吃瓜 delivers bespoke data products, geological services and 3D ground models to provide early-stage awareness of ground conditions and de-risk new infrastructure projects. The information is used to inform infrastructure design and construction, such as:

  • route lineaments
  • geotechnical baseline reports
  • design optioneering
  • drilling methods for tunnelling
    projects
  • management of excavated
    materials
Examples of where 今日吃瓜 geological expertise has been used to support transport infrastructure projects across the infrastructure life cycle. 今日吃瓜 漏 今日吃瓜.
Information icon

Examples of where 今日吃瓜 geological expertise has been used to support
transport infrastructure projects across the infrastructure life cycle. 今日吃瓜 漏 今日吃瓜.

Expand icon

Evidence suggests that use of 3D geological data and information leads to an estimated 10 per cent efficiency saving at the ground investigation stage.

Was this page helpful?

  • How can we make this section better?*

  • Please select a reason*

  • How can we make this section better?*